Cut-and-cover tunnel
High Speed Rail (Crewe – Manchester) Environmental Statement, Glossary, abbreviations and references, published by the Department for Transport in 2022, defines a cut-and-cover tunnel as: ‘A tunnel constructed by excavating a cutting constructing a box-type structure and reinstating the ground over the top to its original level. Cut-and-cover tunnels can be constructed in two ways:
• ‘bottom up’ where an excavation is created from the surface, before the tunnel floor, walls and roof are then built and the entire structure buried and the surface restored; and
• ‘top down’ where the tunnel walls are inserted into the ground and the roof added, before the material within the tunnel is excavated from either end.’
[edit] Related articles on Designing Buildings
Featured articles and news
Our next guest editor Christine Peever
Practising Architect and Director of Sheldon Peever Studio.
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
New electrical apprentice rates
Fair pay for much needed pipeline of electrical apprentices.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.